DRAWWORKS – RIG MANUFACTURING

Workover rig drawworks connect drill line

Workover rig drawworks connect drill line

The drawworks reels in and reels out the drilling line. The drilling line is connected to the traveling block and hook which connect to the drill string. The drill string runs over the crown block and setup like a block and tackle pulley system. [pdf]

Drilling land rig

Drilling land rig

A drilling rig is an integrated system that , such as oil or water wells, or holes for and other construction purposes, into the earth's subsurface. Drilling rigs can be massive structures housing equipment used to drill , , or natural gas extraction wells, or they can be small enough to be moved manually by one person and such are called . Drilling rigs can s. [pdf]

Run casing drilling rig

Run casing drilling rig

Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. . A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.