This DTH drilling rig is specifically designed for photovoltaic foundation pile holes. It is equipped with an 86kW engine and a high-efficiency desert air filter, supporting a maximum drilling diameter of 500mm.
[pdf] Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. When pulling the pipe, the hole shall be kept full from the trip tank. The hole shall be checked regularly to ensure that it is taking the correct amount of fluid. The volume required to fill the hole every 3-5 stands shall be recorded in the Trip Sheet until the bit is out of the hole.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]