Drilling in the Permian Basin remains steady, based on figures from the latest Baker Hughes rig count. The report showed 303 oil and gas rigs were active in the basin of West Texas and southeast New Mexico. It was the highest count in all of the nation’s various shale plays.
[pdf] Drill pipe with tool joints can be determined by their configuration or upset on both ends. The upset of the drill pipe allows welding of the tool joints and can be categorized as: 1. Internal Upset (IU): The dril.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]