Every year, drill rigs and other heavy, specialty equipment used for deep foundation construction (Figure 1) overturn potentially causing injuries and fatalities, as well as damage to the surrounding sites. There are many safety hazards associated with working around this heavy equipment, including the “Focus Four. .
Chicago, Illinois In an incident in Chicago in 2021 (Figure 2), a 100-ton hydraulic drill rig toppled over knocking down power lines and striking a vehicle.. .
In construction, the foundation is the lowest part of a structure that creates stability by transferring loads from the structure to the ground. Deep. .
Contributing factors to these incidents include poor working platforms and improper use of the equipment. Poor Working Platforms Often, pressures exerted by drill rigs on soil subgrades exceed the loads that will be produced by the completed building. However, the working subgrade beneath heavy equipment (the working platform). .
The Deep Foundations Institute (DFI), the International Association of Foundation Drilling (ADSC) and the Pile Driving Contractors Association (PDCA) have established an Industry-Wide Working Platform Work Groupto improve design and safe construction practices for deep foundation installation. In 2017, DFI conducted an informal survey.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf] 
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams.
[pdf]