181 PROCESS FLOW DIAGRAM PFD SYMBOLS FOR ENGINEERS

Crawler drilling rig flow control

Crawler drilling rig flow control

The hydraulic system is the muscle of the crawler mounted drill rig, and its control is a vital part of the overall control system. Hydraulic valves are used to direct the flow of hydraulic fluid to different actuators, such as cylinders and motors. [pdf]

Flow line drilling rig

Flow line drilling rig

A flow line, used on a drilling rig, is a large diameter pipe (typically a section of casing) that is connected to the bell nipple (under the drill floor) and extends to the possum belly (on the mud tanks) and acts as a return line (for the drilling fluid as it comes out of the hole), to the mud. . The is used to slow the flow of returning before it hits the . This enables the shale shaker to clean the. . A stinger line is similar to a flow line, but unlike a flow line is not used to maintain circulation. The stinger line is attached to the . Another common add on is the sample box. This is a heavy duty rubber hose that is inserted at the end of the flow line and at the other end emplaced into the sample box itself. The. [pdf]

Onshore drilling rig diagram

Onshore drilling rig diagram

Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.