300 FT JACKUP RIG – ATLANTIC 7

Jackup drilling rig

Jackup drilling rig

A jackup rig is a barge fitted with long support legs that can be raised or lowered. The jackup is maneuvered (self-propelled or by towing) into location with its legs up and the hull floating on the water. Upon arrival at the work location, the legs are jacked down onto the seafloor. Then "preloading" takes place, where the weight of the barge and additional ballast water are used to dr. OverviewA jackup rig or a self-elevating unit is a type of mobile platform that consists of a buoyant fitted with a number of movable legs, capable of raising its hull over the surface of the sea. The buoyant hull enables tra. . Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site. [pdf]

Elevator drilling rig

Elevator drilling rig

Drill pipe elevators for USC with taper shoulder and square shoulder weld-on tool joints shall have bore dimensions as specified in Table 1. Notes on Table 1: Oilfield elevators with identical bores are the same. 1. * Not Manufactured. 2. ** Obsolescent connection. 1. 1 Dimension DTE from API Spec. 7, Table 4.2 2. 2. . A very close fit of the hinge pin and pawl significantly affects the correct functioning of an elevator – especially the center-latch elevator. If there is play in the hinge, the elevator tends to. . In addition to the side-door elevator, single-joint and slip-type casings are used in running casing. We use a single-joint elevator (Figure 7) to. . Since both care and inspection procedures depend primarily upon the amount of service the equipment has had, it is challenging to project. . The following checks apply to all types of elevators. For a quick reference to critical points of the drill pipe elevators, see Figure 29. 1. Is the oilfield elevator size correct? 2. Are the dies of slip-type elevators sharp? 3. Are the hinge pin or holes worn? 4. Are. [pdf]

Drilling rig traveling block

Drilling rig traveling block

This block is a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the sheaves on the crown and through the sheaves in the traveling block. This provides a significant mechanical advantage to the drill line, enabling it to lift heavy loads of pipe and casing. The. . The size of the groove should be the same as the diameter of the drilling line to deliver the proper support. A tiny pulley groove could cause high friction. Furthermore, it can cause. . Periodic inspections: The Rig Traveling Block, as with all Hoisting equipment, must be inspected according to the manufacturer’s recommendations and API RP 8B or related ISO (International. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.