Innovations in rig automation, drill string design, drilling fluid chemistry, and the workhorse polycrystalline diamond compact drill bit continue to allow drillers to get wellbores to total depth in less time across all major U.S. basins, observes Cristi Harrington, vice president of North American sales for drilling contractor, Helmerich & Payne.
[pdf] 
DTH technique was used in well drilling exclusively to dig, accurate, vertical bores, and rotary drilling was used to turn the hole. The Directional DTH system, patented by Atlas Copco, was first used successfully in 2012 by drilling crews in the Marcellus Shale region of the United States to steer percussive drilling.. .
The DTH system is easy and quick to adapt to a directional drill and is considered one of the best and most effective methods to drill high-quality holes that are stable and straight. It can be done on both hard and soft rock and is extensively used in. .
The DTH method is the most productive and cost-effective method. It is environmentally friendly, as it produces lesser noise and. .
Below are few of the many benefits associated with DTH drilling: 1. The DTH system is easily adaptable to most directional drills in a short period of time. 2. Lower operating. This method utilizes a unique hammer drilling system where the percussion mechanism is located directly behind the drill bit at the bottom of the hole. The system consists of three main components: a drill bit, a hammer mechanism, and drill pipes.
[pdf] 
This is the tank from which drilling fluid is pumped downhole and to which drilling fluid returns from the hole is received. The route taken by the drilling fluid when circulating is called the active (circulating) system. At the start of circulation, the Mud Pumps are lined up on the Active Tank, and drilling fluid is. .
These are used for storing fluids according to requirements. Reserve mud is usually prepared or stored in these tanks or different fluids in preparation for. .
The Sand Traps are usually positioned below the shale shakers and act as settling pits for the drilling fluid after passing through the shale shakers. The. .
These tanks are more minor than active and reserve tanks. They are used for preparing “slugs” (high-density mud that is pumped into the drill string before tripping out of the hole) and pills to address particular situations (e.g. an LCM pill to control formation losses, a unique mix to improve drilling mud properties, etc.). .
The Trip Tank is a tall, narrow tank located near the flow line and used for accurately monitoring drill pipe displacement volumes while tripping pipe in or out of the hole. Active drilling mud from the Trip Tank is circulated across the hole, and valves in the flow line near the Bell Nipple are realigned to send the fluid returns back to the Trip .
[pdf]