BATCH DRILLING OF TWO EXPLORATION WELLS FROM A JACK UP RIG

Jack up drilling rig design

Jack up drilling rig design

Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site with the hull lowered to the water level, and the legs extended above the hull. The hull is actually a water-tight barge that floats on the water's surface. When the rig reaches the work site, the crew jacks the legs downward through the water and int. [pdf]

Rotary drilling rig digging water wells

Rotary drilling rig digging water wells

The standard method involves percussion drilling in which a drill is alternatively raised and dropped in the descending borehole. It is suited to the drilling of wells in any material from soft clay to the hardest rock. [pdf]

Run casing drilling rig

Run casing drilling rig

Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. . A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.