The drawworks reels in and reels out the drilling line. The drilling line is connected to the traveling block and hook which connect to the drill string. The drill string runs over the crown block and setup like a block and tackle pulley system.
[pdf] Before any workover, the well must first be . Since workovers are long planned in advance, there would be much time to plan the and so the reverse circulation would be common. The intense nature of this operation often requires no less than the capabilities of a . The workover begins by killing the well then removing the wellhead and possibly the flow line, then installing a B.O.P. commonly known as a , then lifting the fr.
[pdf] A jackup rig is a barge fitted with long support legs that can be raised or lowered. The jackup is maneuvered (self-propelled or by towing) into location with its legs up and the hull floating on the water. Upon arrival at the work location, the legs are jacked down onto the seafloor. Then "preloading" takes place, where the weight of the barge and additional ballast water are used to dr. OverviewA jackup rig or a self-elevating unit is a type of mobile platform that consists of a buoyant fitted with a number of movable legs, capable of raising its hull over the surface of the sea. The buoyant hull enables tra. .
Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site.
[pdf]