Land rigs are generally either wheel-mounted portable types or a component system that must be moved by trucks and cranes. The drilling floor generally sits on top of a steel substructure that could be 30 feet high or more. A drilling mast (derrick) is attached to and raised above the floor. In general, the deeper. .
One of the Oil Rig Hazards types is the hostile environment. The effects of greater water depths, storms, wave action, and uncertain exploratory data all greatly increase the financial. .
Drill ships are ships specially built and modified to drill in deep water or in operations that are not suitable for semi-submersible rigs. Drill ships are self-propelled and can. .
This article lists the main components of a onshore . rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but typically includes at least some of the items listed below.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf] 
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams.
[pdf]