Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf] Mars field was discovered in 1989 at around 130 miles south of New Orleans. The field, located at 3,000ft water deep, started production in 1996. Mars B was discovered after Shell geologists located untappe.
[pdf] This block is a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the sheaves on the crown and through the sheaves in the traveling block. This provides a significant mechanical advantage to the drill line, enabling it to lift heavy loads of pipe and casing. The. .
The size of the groove should be the same as the diameter of the drilling line to deliver the proper support. A tiny pulley groove could cause high friction. Furthermore, it can cause. .
Periodic inspections: The Rig Traveling Block, as with all Hoisting equipment, must be inspected according to the manufacturer’s recommendations and API RP 8B or related ISO (International.
[pdf]