Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site with the hull lowered to the water level, and the legs extended above the hull. The hull is actually a water-tight barge that floats on the water's surface. When the rig reaches the work site, the crew jacks the legs downward through the water and int.
[pdf] There are many different types of facilities from which offshore drilling operations take place.OverviewAn oil platform (also called an oil rig, offshore platform, oil production platform, etc.) is a large structure with facilities to extract and process and that lie in rock formations beneath the .. .
Jan Józef Ignacy Łukasiewicz (Polish pronunciation: ; 8 March 1822 – 7 January 1882) was a Polish pharmacist, engineer, businessman, inventor, and philanthropist. He was one of the most pr.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf]