DRILLING A WELL WITH A WELL POINT A STEP BY STEP GUIDE

European Engineering Water Well Drilling Rig Maintenance Point

European Engineering Water Well Drilling Rig Maintenance Point

This is job No. 1. It doesn’t matter how regular you are about maintenance if the person handling the tools doesn’t know what he’s doing. Says Caho: “You need someone who’s actually trained to do it.” From w. [pdf]

Engineering water well drilling rig maintenance point

Engineering water well drilling rig maintenance point

This is job No. 1. It doesn’t matter how regular you are about maintenance if the person handling the tools doesn’t know what he’s doing. Says Caho: “You need someone who’s actually trained to do it.” From w. The main job is to wipe the surface of the drilling equipment clean, clean the base groove and vertical surface of the lubrication part of the drilling equipment; tighten all exposed screws, nuts, and others; check the transmission, shifting The position and leakage of the oil in the tank hydraulic system and solve the problem in time. [pdf]

Different parts of a drilling rig

Different parts of a drilling rig

Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). . • (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.