EXCAVATION RIG GENESIS PART 2

Genesis drilling rig
Genesis lies in the Viosca Knoll Carbonate Trend. The field contains reserves of 160 million bbl. Following drilling, flow tests were conducted in which the field produced at rates of up to 8,300 barrels (bbl) per day. Production will peak at about 55,000bbl of oil and 72 million cubic feet of natural gas per day. . The engineering design and procurement was handled in two phases. The front-end engineering (FEE) included the preparation of installation plans, electrical lines, equipment arrangement and cost estimates. The detailed engineering phase included the deck’s. . Fabrication of the platform’s deck was carried out at McDermott’s Morgan City facility in Louisiana. Engineering was provided by McDermott Engineering Houston. The topsides have a deck surface area of about 100,000ft² (three 175ft x 175ft levels). . Genesis is being developed using a cylindrical steel spar, which supports both the drilling operations and production facilities. This makes it the world’s first drilling / production spar. Air-filled compartments on the upper portion of the cylinder provide. . The Genesis hull is 122ft in diameter and 705ft-tall. It was manufactured in two halves at Aker Rauma’s Pori yard, in Finland. The first half, weighing 10,842t was sailed to Corpus. [pdf]FAQS about Genesis drilling rig
What makes Genesis a good drilling / production spar?
Genesis is a good drilling / production spar because it is being developed using a cylindrical steel spar that supports both the drilling operations and production facilities. This makes it the world’s first drilling / production spar. Air-filled compartments on the upper portion of the cylinder provide buoyancy, while seawater-filled tanks on the bottom give weight and stability.
What is a mining drill in Genesis?
The Mining Drill is a Weapon in the Expansion Pack Genesis: Part 1. The Mining Drill functions as a powerful harvesting tool that aids in the collection of just about nearly every resource from any natural-spawning resource node. Utilizing Gasoline, it fires a laser to drill through the...
What is Genesis?
GENESIS connects suppliers around the world to provide drilling tools at a fair price. GENESIS specializes in Premium Tubulars and pre-owned rig equipment. GENESIS partners with manufacturers to offer lowest costs for new/surplus inventory. GENESIS' founder, EC Gabehart, has dedicated 40+ years to connect & catalyze partners around the world.
How much oil does Genesis produce a day?
The Genesis Oil Field produces up to 8,300 barrels (bbl) per day following drilling and flow tests. The peak production is expected to be about 55,000 bbl of oil and 72 million cubic feet of natural gas per day.
What is the water depth of the Genesis Hull?
The Genesis production facility is moored in water depth of 2,600ft. The Genesis spar platform hull was delivered in June 1998. The Genesis field is located 150 miles south of New Orleans, across the three Green Canyon blocks 160, 161 and 205. The water depth varies from 2,500ft to 3,000ft.
How were the Genesis topsides manufactured?
The Genesis topsides were manufactured as two units: the production deck and the drill / utility deck. Before loadout, the drill / utility deck was cut into two pieces (between truss rows one and two) for easier transportation. The Genesis hull is 122ft in diameter and 705ft-tall.

Russian excavation and conversion hydraulic rock drill manufacturer
Ural Siberian Industrial Company (USIC) – Russian manufacturer of completed drilling rigs for production and exploration drilling. Additionally, USIC manufactures drilling rigs components and units, as well as modernizes drilling equipment. [pdf]
Parts of drill rig
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). . • (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams. [pdf]FAQS about Parts of drill rig
What are the components of a drilling rig?
1. Mast or Derrick Usually the first component of the drilling rig people notice, the mast is a tall fabricated structure towering above all the other drilling components. The mast is vitally important, as it supports the components of the drilling mechanism hovering above the point where drilling will take place.
How many systems are there on a drilling rig?
There are 4 main systems on a drilling rig: Ac-Dc Power Generation Station Example: Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe.
How does a drilling rig work?
The drilling line spools out under gravity and is reeled in by an electrical or diesel engine. The Crown Block as a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks.
What is a drilling rig mast?
Usually the first component of the drilling rig people notice, the mast is a tall fabricated structure towering above all the other drilling components. The mast is vitally important, as it supports the components of the drilling mechanism hovering above the point where drilling will take place. 2. Drilling Line
What is an offshore drilling rig?
Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but typically includes at least some of the items listed below.
How many brake systems does a drill rig have?
On most rigs, there are at least two brake systems. stop. a loaded traveling block, but is not capable of bringing it to a complete stop. An integral part of the drawworks is the gear system. This gives the driller a wide choice of speeds for hoisting the drillstring. two catheads.