This Best Practice provides guidance for improving safety when working around drilled holes on distribution and transmission projects. Operating Units have the responsibility to put in place those measures tha.
[pdf] You need to remove the "T" or "L" connector from the top of the nozzles bulkhead assy. Press down on the bulkhead's collet, while pulling on the "T" connector to safely remove. Then remove the top nut off the bulk head. Now take your nozzle and insert it up and through the hole in the cage corner.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.