INTEGRATED MAST AND TOP DRIVE FOR DRILLING RIG

Mast in drilling rig

Mast in drilling rig

The mast is normally used on land drilling rig types requiring a good deal of mobility; they are rarely used on offshore rigs. The racking board is in a cantilever position and lengths of drill pipeare racked on a floor, called the setback, that is separate from the mast structure. Most masts have one side open (window side),. . There are different types of masts for land drilling and service rigs: 1. Folding Type 2. Telescopic Masts 3. Bootstrap Type 4. Portable/Cantilivered masts (Non-Guy line) . Figure 8 shows a telescopic mast. Telescopic masts with their drawworks and engines are usually mounted on trucks or trailers. The load should be borne by hydraulic or. . Each structure shall be rated for the following applicable loading conditions. The following ratings do not include any allowance for impact. Acceleration, impact, setback, and wind loads will reduce the rated static hook load capacity. Technical specifications are identical to those for derricks: 1. Maximum hook load given the reeving system, 2. F. . For conventional Mast (Land rig), the below pictures show the erection sequence of rigging up For rigging up the vertical mast, the below pictures show the bootstrap sequence of rigging up. [pdf]

Drilling rig mast

Drilling rig mast

The mast is normally used on land drilling rig types requiring a good deal of mobility; they are rarely used on offshore rigs. The racking board is in a cantilever position and lengths of drill pipeare racked on a floor, called the setback, that is separate from the mast structure. Most masts have one side open (window side),. . There are different types of masts for land drilling and service rigs: 1. Folding Type 2. Telescopic Masts 3. Bootstrap Type 4. Portable/Cantilivered masts (Non-Guy line) . Figure 8 shows a telescopic mast. Telescopic masts with their drawworks and engines are usually mounted on trucks or trailers. The load should be borne by hydraulic or. . Each structure shall be rated for the following applicable loading conditions. The following ratings do not include any allowance for impact. Acceleration, impact, setback, and wind loads will reduce the rated static hook load capacity. Technical specifications are identical to those for derricks: 1. Maximum hook load given the reeving system, 2. F. . For conventional Mast (Land rig), the below pictures show the erection sequence of rigging up For rigging up the vertical mast, the below pictures show the bootstrap sequence of rigging up. [pdf]

Top drive system drilling rig

Top drive system drilling rig

The top drive is one of the components of the drilling rig that is used to rotate the drill string during drilling, having 1000 horsepower, which rotates the shaft to which the drill string is attached. It decreases the amount of manual work and labor that is involved in the conventional drilling Kellysystem, hence,. . The top drive has many advantages that help better its functions during the drilling involving safety and efficient way of drilling and are enlisted below: 1. In the top drive system, it is. . The following list is the list of components that are involved in a tip drive system: 1. Elevator 2. Bail Assembly 3. Grabber Assembly 4. Saver Sub 5. Stabbing Valve 6. Tilt. . As the rotation to the drill stem is provided by the top drive, in the top drive system, so the Kelly and the Kelly bushing is not required in this system. However; for the support of slip and weight of a drill stem and as an opening for lowering or raising of drill stem into the borehole, a rotary table, and a master bushing are installed in this . . A top drive is a mechanical device on a that provides clockwise torque to the to drill a . It is an alternative to the and . It is located at the place below the traveling block and moves vertically up and down the derrick. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.