The entire hoisting installation comprising draw-works, drum, and brakes is shown schematically in Figure 2. Factors to be considered when a hoisting system is designed or chosen are: 1. The maxim. The hook block assembly is the hoisting equipment for oil-drilling rig. It is mainly used to hoist and trip the drill pipe, replace bits, run the casing during petroleum drilling operation by cooperated with crown block, swivel, and elevator ring.
[pdf] Install the valve with proper positioning of the flow arrow. Support and align adjacent piping and the vale. Install lubricated flange bolts. Hands tighten, and then torque the bolts using the crossover flange bolt-tightening method to load the bolts evenly, and eliminate concentrated stresses.
[pdf] The longer your feed rail, the more important the addition of the energy chain becomes to the overall effectiveness of your machine. We offer a range of feed rail options from 6′ to 24′ for our Skid Steer and E.
[pdf]