JACK UP DRILLING RIG MOTEL

Jack up drilling rig design

Jack up drilling rig design

Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site with the hull lowered to the water level, and the legs extended above the hull. The hull is actually a water-tight barge that floats on the water's surface. When the rig reaches the work site, the crew jacks the legs downward through the water and int. [pdf]

Jack up drilling rigs

Jack up drilling rigs

Mobile offshore Drilling Units (MODU) This type of rig is commonly used in connection with oil and/or natural gas drilling. There are more jackup rigs in the worldwide offshore rig fleet than other type of mobile offshore drilling rig. Other types of offshore rigs include semi-submersibles (which float on pontoon-like structures) and drillships, which are ship-shaped vessels with rigs mounted in t. OverviewA jackup rig or a self-elevating unit is a type of mobile platform that consists of a buoyant fitted with a number of movable legs, capable of raising its hull over the surface of the sea. The buoyant hull enables tra. . Jackup rigs are so named because they are self-elevating with three, four, six and even eight movable legs that can be extended (“jacked”) above or below the hull. Jackups are towed or moved under self propulsion to the site. . An early design was the DeLong platform, designed by Leon B. DeLong. In 1949 he started his own company, DeLong Engineering & Construction Company. In 1950 he constructed the DeLong Rig No. 1 for. [pdf]

Different parts of a drilling rig

Different parts of a drilling rig

Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). . • (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.