METHOD STATEMENT FOR POST FIXED REBAR

Dth drilling rig method

Dth drilling rig method

DTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling applications, its name originated from the fact that the percussion mechanism followed the bit down into the hole. Applications were later found for the DTH method. . A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a. . A is first thought to have been used for rock drilling in 1844. Many quarries used hand held tools that required the driller to suspend himself from a rope over the. . In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the fluid (air, water or drilling mud) used to. . DTH products can be used in the following applications:• Mining- drill and blast holes in open pit mining, where the drill operator will drill several holes, then. In down-the-hole drilling a drill rod is fitted with a hammer at its lower end. The hammer, which is mounted on the drill bit, is activated through the addition of compressed air and driven into the ground – simultaneously rotating and impacting. [pdf]

Correct method of wiring two screw air compressors

Correct method of wiring two screw air compressors

To connect two compressors in parallel, follow these steps: Make sure both compressors have the same voltage and phase. Install a check valve on each compressor’s discharge line to prevent backflow. Install a tee fitting on each compressor’s discharge line. Connect the two tee fittings with a pipe.. To connect two compressors in parallel, follow these steps: Make sure both compressors have the same voltage and phase. Install a check valve on each compressor’s discharge line to prevent backflow. Install a tee fitting on each compressor’s discharge line. Connect the two tee fittings with a pipe.. The Short Answer: The basic process involves setting up a single pressure switch system linking both compressors, using a check valve to prevent air backflow, and using suitable hoses or pipes. [pdf]

Oil-free air compressor screw disassembly method

Oil-free air compressor screw disassembly method

Use your Phillips head screwdriver to loosen the screw located either on the top or on the side of the cover. Unhook all of the black and white wires from the pressure switch using the needle nose pliers. Take a 5/16” nut driver and remove the ground screws, holding down the ground wires. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.