Install the valve with proper positioning of the flow arrow. Support and align adjacent piping and the vale. Install lubricated flange bolts. Hands tighten, and then torque the bolts using the crossover flange bolt-tightening method to load the bolts evenly, and eliminate concentrated stresses.
[pdf] 
DTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling applications, its name originated from the fact that the percussion mechanism followed the bit down into the hole. Applications were later found for the DTH method. .
A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a. .
A is first thought to have been used for rock drilling in 1844. Many quarries used hand held tools that required the driller to suspend himself from a rope over the. .
In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the fluid (air, water or drilling mud) used to. .
DTH products can be used in the following applications:• Mining- drill and blast holes in open pit mining, where the drill operator will drill several holes, then. In down-the-hole drilling a drill rod is fitted with a hammer at its lower end. The hammer, which is mounted on the drill bit, is activated through the addition of compressed air and driven into the ground – simultaneously rotating and impacting.
[pdf] To connect two compressors in parallel, follow these steps: Make sure both compressors have the same voltage and phase. Install a check valve on each compressor’s discharge line to prevent backflow. Install a tee fitting on each compressor’s discharge line. Connect the two tee fittings with a pipe..
To connect two compressors in parallel, follow these steps: Make sure both compressors have the same voltage and phase. Install a check valve on each compressor’s discharge line to prevent backflow. Install a tee fitting on each compressor’s discharge line. Connect the two tee fittings with a pipe..
The Short Answer: The basic process involves setting up a single pressure switch system linking both compressors, using a check valve to prevent air backflow, and using suitable hoses or pipes.
[pdf]