The and the topsides of the Perdido were constructed separately and then assembled in its final position in the Gulf of Mexico. The Perdido's hull or spar was constructed by in . A barge shipped the 22,000 tonne spar 13,200 kilometres (8,200 miles) from the to the Gulf of Mexico. After floating the spar, it was towed to its final home above the Alaminos canyon 320 kilometres (120 miles) fr.
[pdf] This article lists the main components of a onshore . rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but typically includes at least some of the items listed below.
[pdf] The Oil Drilling Rig is a multiblock machine added by GregTech 5 Unofficial, used to pump oil or natural gas. Oil can be refined into plastics to use as crafting components, and both oil and natural gas may b.
[pdf]