The and the topsides of the Perdido were constructed separately and then assembled in its final position in the Gulf of Mexico. The Perdido's hull or spar was constructed by in . A barge shipped the 22,000 tonne spar 13,200 kilometres (8,200 miles) from the to the Gulf of Mexico. After floating the spar, it was towed to its final home above the Alaminos canyon 320 kilometres (120 miles) fr.
[pdf] Mars field was discovered in 1989 at around 130 miles south of New Orleans. The field, located at 3,000ft water deep, started production in 1996. Mars B was discovered after Shell geologists located untappe.
[pdf] This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf]