PAT HINDS ON LINKEDIN CACTUS DRILLING

Cactus drilling new rig

Cactus drilling new rig

Rig 169 will be drilling in the Anadarko Basin in the Texas Panhandle for Tecolote Energy headquartered in Tulsa. “Rig 169 is a fit-for-purpose, tier 1 AC drilling rig that is ideally-equipped for multi-well pads and extended laterals,” said Josh Simons, Cactus’ Vice President of Operations. [pdf]

FAQS about Cactus drilling new rig

What is a cactus rig 172?

Cactus Rig 172 is an 1,800-horsepower AC-driven land drilling rig operated by Cactus Drilling, the largest privately held U.S.-based land drilling contractor. The rig is an Alta ARS-1813 model, classified under Cactus Drilling’s “ROCKET” series, which is designed for high-performance drilling operations. Total Wells Drilled

How many cactus rigs have been drilled this year?

As of this year, a total of 120 wells have been drilled by Cactus rigs, demonstrating strong industry demand and continued investment in drilling operations. Below, we break down the latest data, highlighting top trends in drilling activity by province, operator, county, and rig utilization.

Who is cactus drilling?

Cactus is a mid-size, U.S. domestic land drilling contractor providing quality people operating premium rigs to deliver safe and reliable results. As of March 2025 Cactus Drilling has drilled 120 wells year-to-date across Texas, Oklahoma, New Mexico, and Louisiana, with Texas leading at 64 wells.

Who uses cactus drilling rigs?

Several major oil and gas operators are leveraging Cactus Drilling rigs for their exploration and production programs. The top 10 operators by record count include: Drilling activity remains concentrated in specific counties with high levels of oil and gas production.

Where are cactus drilling rigs located?

Coterra Energy is the top operator with 23 wells, and Lea County, NM, is the most active drilling location with 9 wells. The most utilized rigs include Cactus 162 and Cactus 140, each drilling 7 wells, reflecting strong and consistent demand for Cactus Drilling’s services.

What are the key trends in Cactus drilling?

The data highlights several important trends in U.S. drilling: Strong activity across multiple provinces, reflecting a broad and sustained demand for drilling services. A diverse set of operators utilizing Cactus Drilling, ranging from major industry players to smaller independents.

Run casing drilling rig

Run casing drilling rig

Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. . A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running. [pdf]

Different parts of a drilling rig

Different parts of a drilling rig

Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. . The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. . The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. . The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. . Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). . • (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.