The rotary drilling hose (API7K) is the flexible connector between the top of the standpipe and the swivel that allows for vertical travel. Its lengths are in the range of 45 ft (13.7 m) and over. We generally use rotar.
[pdf] 
Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. Tong safety lines should be of sufficient length, preferably allowing a 90° breakout angle between the. .
Ensure that the crew is up to strength and that individuals know the tasks to be carried out. A communication system should be operational between. .
Considerable preparation is required before the trip is commenced. The following are among the most essential actions that should be carried out. .
Having completed the preparations outlined in the previous section, the trip out of the hole can be started. The following procedure is proposed as a guideline: 1. Flow checkthe well with the pumps off to ensure that the well is static. 1. Pump a slug. This enables the pipe to be pulled dry and the hole to be accurately monitored during a trip. 2. . .
Tripping pipe (or "Making a round trip" or simply "Making a trip") is the physical act of pulling the out of the and then running it back in. This is done by physically breaking out or disconnecting (when pulling out of the hole) every other 2 or 3 joints of at a time (called a ) and racking them vertically in the . When feasible the will start each successive trip o.
[pdf] Drill stems must be designed to transfer drilling torque for combined lengths that often exceed several miles down into the , and also must be able to resist pressure differentials between inside and outside (or vice versa), and have sufficient strength to suspend the total weight of deeper components. For deep wells this requires tempered steel tubes that are expensive, and owners spend considerable efforts to reuse them after finishing a well.
[pdf]