Raise the bottom of the mast to the rig floor and pin it in place. Raise the crown section into place on the derrick stand. Raise the "A-legs" and pin them into place. Pin the monkeyboard in place on the mast. Lay out all lines and cables to prevent tangling when the mast is raised. [pdf]

FAQS about Raising procedure for ideco hfr 142 1000 drilling rig

How much does an Ideco 1000 hp rig cost?

IDECO 1000 HP DRILLING RIG (Ref#9965Tb) Manufactured 2004, 117’ SHL telescoping mast, mounted on 3 axle, 358,000# static hook load, 5-sheave travel block, racking board, mounted on 3 axle trailer, optional 250 ton top drive/power swivel Price as is: $700,000 Price reworked cleaned, painted and certified: $1,300,000

How much does an Ideco H44 drill rig cost?

IDECO H44 DRILL RIG (Ref#3977T) 1000 hp trailer mounted drill rig, (2) Detroit 60 Series engines 475 hp each @ 1800 rpm, 117’ x 450,000# derrick, 17’ adjustable substructure, Century 17-1/2” x 44” rotary tble, National 160 ton Shorty block, V door catwalk, water tank/doghouse combo Price: $275,000

How should a rig rig be secured before raising a mast?

Be sure the derrick escape device is in place and the line is properly secured to the mast before raising the mast. All rig floor winch lines, tong hanger lines, etc., should be secure to prevent them from getting tangled with the blocks as the mast is raised.

How much does a Ideco H37 rig cost?

IDECO H37 WELL SERVICE RIG (Ref#1683RR) 103' x 244,000# franks telescoping hydraulically raised mast, Detroit Series 60 diesel engine, Allison 5860 transmission, mounted on 5 axle carrier, hyd leveling jacks, hyd utility hoist, air and hyd controls, front flotation tires Price: $245,000

How much does a 1000 hp drill rig cost?

IDECO 1000HP DRILLING RIG (Ref#11167N) Single drum drawworks, 1-1/8" drilling line, hydramatic brake, 2 engine compound (2) Detroit Series 60 diesel engine 550 hp each (drives rig and carrier), 112' x 378,000# mast, 8 lines, 16' substructure, mounted on 6 axle carrier, (2) 6061 Allison transmission, No additional equipment Price: $825,000

How much does a dreco H44 rig cost?

IDECO H44 DRILL RIG (Ref#3981T) Drive in, rated to 6500’ with 4-1/2” drill pipe, (2) Detroit 871 engines (305 hp each), Ideco 108’ x 268,000# mast, 12’ H telescoping substructure, Dreco 150 ton block, ZP 17-1/2” x 44” rotary table, V-door catwalk, water tank/doghouse combo Price: $215,000

Drilling rig inspection

Drilling rig inspection

The General Mud system inspection checklist includes the following: High-Pressure Mud System, General Mud Pumps, Other High-Pressure Equipment, Low-Pressure Mud System, Mud Tank System, Solids Remo. . Accommodation & storage checklist includes: General, Offices, Living Quarters, Galley, Medical, General, Main Deck, Helideck,. [pdf]

FAQS about Drilling rig inspection

What is a rig inspection?

Rig inspections, also known as rig audits, are conducted on drilling assets for both drilling contractors and drilling operators to assess the condition of an asset. Rig inspections are conducted to industry standards, such as API, as well as to specific client requirements.

What is included in a drill rig inspection checklist?

Drilling Rig Rotating Equipment Inspection Checklist, which includes the following: Rotary Table (Rt), Driller Control Instruments (DCIS) (Check also Driller Job Descriptions), Iron Roughneck Ir, Pipe Spinner Ps (If Applicable), Drill String Components (Tested As Per Api Rpg), Other Drilling Equipment, Top Drive.

Who conducts rig inspections?

Rig inspections can be conducted by either the owner or operator of a drilling asset. Services for rig commissioning are conducted prior to the equipment entering service. This can be at the end of construction or during major overhauls and five-yearly inspections.

What is rig inspection & rig commissioning?

Rig inspection and rig commissioning are critical to the oil and gas industry. Rig inspections can be carried out both before the hiring of a drilling asset and during the contract. A pre-hire rig inspection/audit assess the condition and suitability of the asset for a drilling contract.

What inspections do drilling rigs undergo?

At the commissioning stage, drilling rigs undergo inspections for acceptance. These usually include inspections of critical systems such as the prime movers that produce energy for the rig, rig floor testing, blowout prevention control systems review, stack acceptance pressure tests, and many other detailed audits.

When should rig inspections be carried out?

Rig inspections can be carried out both before the hiring of a drilling asset and during the contract. A pre-hire rig inspection/audit assess the condition and suitability of the asset for a drilling contract. During the contract, rig inspections assess both the asset’s operational condition and its compliance with the terms of the contract.

Iadc drilling rig safety inspection checklist

Iadc drilling rig safety inspection checklist

The checklist combines the applicable requirements of 29 CFR 1910, American National Standards Institute (ANSI) Standards, American Petroleum Institute Recommended Practice 54 (API RP54), other more specific American Petroleum Institute Recommended Practices, and the current and previous checklists for drilling and well servicing rigs generated by the International Association of Drilling Contractors (IADC) and the Association of Energy Service Companies (AESC). [pdf]