Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. When pulling the pipe, the hole shall be kept full from the trip tank. The hole shall be checked regularly to ensure that it is taking the correct amount of fluid. The volume required to fill the hole every 3-5 stands shall be recorded in the Trip Sheet until the bit is out of the hole.
[pdf] Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. Tong safety lines should be of sufficient length, preferably allowing a 90° breakout angle between the. .
Ensure that the crew is up to strength and that individuals know the tasks to be carried out. A communication system should be operational between. .
Considerable preparation is required before the trip is commenced. The following are among the most essential actions that should be carried out. .
Having completed the preparations outlined in the previous section, the trip out of the hole can be started. The following procedure is proposed as a guideline: 1. Flow checkthe well with the pumps off to ensure that the well is static. 1. Pump a slug. This enables the pipe to be pulled dry and the hole to be accurately monitored during a trip. 2. .
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.