
Our survey services cover all the critical needs of rig operators, ensuring compliance with regulations and proactive maintenance planning. Key services include: Special Periodic Surveys (SPS) and Class Surveys Allrig conducts Special Periodic Surveys (SPS) and other Class-related inspections in full compliance with. .
At Allrig, we don’t just identify issues—we solve them. Our rectification services ensure that areas not meeting condition expectations are addressed promptly and effectively. 1. On-the. .
Allrig’s global reach and local expertise make us the ideal partner for your survey and maintenance needs. With a focus on compliance, safety, and proactive solutions, we provide unparalleled support to rig operators worldwide. Whether you need SPS, UWILD,. .
Would you like to learn more about how our survey solutions can support your business? Looking for a service partner with global capabilities and local expertise? Or do you. All MOU/rigs need to renew the main classification certificates every five year, through the special periodical survey (SPS). During the SPS, it is time to test, check and verify the performance of the cathodic protection system.
[pdf] Before starting casing, the drilling supervisor should hold a pre-job safety meeting and confirm the following with the crew: 1. Remove unnecessary tools. 2. Good Housekeeping before the job 3. Rig up Casing handling equipment: Using appropriate hand. .
A circulation sub, fitting the casing thread, equipped with a WECO connection, shall be readily available on the rig floor at all times during casing running.
[pdf] 
Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the . #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams.
[pdf]