Drilling derricks and Rig Masts consist of a steel framework with a square or rectangular cross-section. Their purpose is to support the hoisting equipment and rack the tubulars while tripping pipe. The number of joints in a stand (single-double-triple) that the rig can pull is dependent on the height of the derrick. .
The Drawworks is one of the most important components of the drilling rig (types of drilling rigs). The unit supplies the hoisting power, the. .
The Crown Blockas a drilling rig component is a fixed set of pulleys (called sheaves) located at the top of the derrick or mast, where the drilling line is threaded. The companion blocks to these pulleys are the traveling blocks. By using two sets of blocks in this fashion,. .
The Traveling Blockis a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the. .
Attached to the bottom of the traveling blocks, the hook is required to hang the swivel and rig kelly(for drilling) and the elevator bales (for tripping pipe and casing). .
This article lists the main components of a onshore . rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but typically includes at least some of the items listed below.
[pdf] 
Many accidents on the drill floorwhile pipe tripping involve using tongs. Injuries result from being caught between tongs and being struck by swinging tongs. All tongs should be securely attached and anchored. Tong safety lines should be of sufficient length, preferably allowing a 90° breakout angle between the. .
Ensure that the crew is up to strength and that individuals know the tasks to be carried out. A communication system should be operational between. .
Considerable preparation is required before the trip is commenced. The following are among the most essential actions that should be carried out. .
Having completed the preparations outlined in the previous section, the trip out of the hole can be started. The following procedure is proposed as a guideline: 1. Flow checkthe well with the pumps off to ensure that the well is static. 1. Pump a slug. This enables the pipe to be pulled dry and the hole to be accurately monitored during a trip. 2. . The underground pipe drilling machine, also named horiztontal directional drilling machine, is a piece of equipment specifically designed to drill holes or tunnels underground to install pipelines. It quickly drills holes in the ground by drilling to lay pipes underground.
[pdf] 
A down-the-hole drill, usually called DTH by most professionals, is basically a jackhammer screwed on the bottom of a drill string. The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or drilling mud). The DTH hammer is one of the fastest ways to drill. .
DTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling. .
A is first thought to have been used for rock drilling in 1844. Many quarries used hand held tools that required the driller to suspend himself from a rope over the. .
In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the fluid (air, water or drilling mud) used to. .
DTH products can be used in the following applications:• Mining- drill and blast holes in open pit mining, where the drill operator will drill several holes, then.