This block is a set of sheaves (pulleys) that move up and down in the derrick. The drilling line is threaded (reeved) over the sheaves on the crown and through the sheaves in the traveling block. This provides a significant mechanical advantage to the drill line, enabling it to lift heavy loads of pipe and casing. The. .
The size of the groove should be the same as the diameter of the drilling line to deliver the proper support. A tiny pulley groove could cause high friction. Furthermore, it can cause. .
Periodic inspections: The Rig Traveling Block, as with all Hoisting equipment, must be inspected according to the manufacturer’s recommendations and API RP 8B or related ISO (International.
[pdf] This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf] NOV's two main predecessors, Oilwell Supply and National Supply, were founded in 1862 and 1893, respectively. These two companies manufactured and distributed pumps and derricks. In 1930, acquired Oilwell Supply. In 1958, merged with National Supply. In 1987, National Supply merged with USS Oilwell to become "National Oilwell". Varco was founded as Abegg and Reinhold Company by Walter Abegg and Baldwin Reinhold i.
[pdf]