
Break Circulation - To establish circulation of drilling fluids after a period of static conditions. Circulation may resume after a short break, such as taking a survey or making a mousehole connection, or after a prolonged interruption, such as after a round trip..
Break Circulation - To establish circulation of drilling fluids after a period of static conditions. Circulation may resume after a short break, such as taking a survey or making a mousehole connection, or after a prolonged interruption, such as after a round trip..
Hydrostatic pressure in drilling refers to the pressure exerted by a column of drilling mud or fluid within a wellbore. It is an essential factor in drilling operations as it balances the formation pressure and prevents well blowouts..
The load exerted on the BOP handling system by the static weight of the BOP stack. Source: API SPECIFICATION 7K, Drilling and Well Servicing Equipment, Sixth Edition, December 2015. Global Standards..
When the well is in a static condition, the bottomhole pressure is equal to the hydrostatic pressure. When the well is circulating, the bottomhole pressure increases due to the applied surface pressure needed to overcome friction pressures in the piping..
It means that the fast line tension will increase under a dynamic condition; however, the dead line tension will remain the same because it is still in static condition.
[pdf] Semi-submersible rigs make stable platforms for drilling for offshore oil and gas. They can be towed into position by a and anchored, or moved by and kept in position by their own with . The MODU Code is an accredited design and operational guideline for mobile offshore drilling units of the semi-submersible.
[pdf] 
This is the tank from which drilling fluid is pumped downhole and to which drilling fluid returns from the hole is received. The route taken by the drilling fluid when circulating is called the active (circulating) system. At the start of circulation, the Mud Pumps are lined up on the Active Tank, and drilling fluid is pumped to. .
These are used for storing fluids according to requirements. Reserve mud is usually prepared or stored in these tanks or different fluids in preparation for. .
The Sand Traps are usually positioned below the shale shakers and act as settling pits for the drilling fluid after passing through the shale shakers. The. .
These tanks are more minor than active and reserve tanks. They are used for preparing “slugs” (high-density mud that is pumped into the drill string before tripping out of the hole) and pills to address particular situations (e.g. an LCM pill to control formation losses, a unique mix to improve drilling mud properties, etc.). .
The Trip Tank is a tall, narrow tank located near the flow line and used for accurately monitoring drill pipe displacement volumes while tripping pipe in or out of the hole. Active drilling mud from the Trip Tank is circulated across the hole, and valves in the flow line near the Bell Nipple are realigned to send the fluid returns back to the Trip .
[pdf]