In hard rock mining and quarrying, this is achieved through a controlled process of drilling and blasting. A blast hole drill rig is a specialised piece of equipment that creates a series of holes in a specific pattern, depth, and diameter across a section of rock known as a “bench.”
[pdf] This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf] This casing string provides initial hole support close to the surface and generally varies in length from about 30 to 300 feet. The casing may be driven or hole drilled. The casing may be cemented if it is nece.
[pdf]