The drawworks reels in and reels out the drilling line. The drilling line is connected to the traveling block and hook which connect to the drill string. The drill string runs over the crown block and setup like a block and tackle pulley system.
[pdf] Before any workover, the well must first be . Since workovers are long planned in advance, there would be much time to plan the and so the reverse circulation would be common. The intense nature of this operation often requires no less than the capabilities of a . The workover begins by killing the well then removing the wellhead and possibly the flow line, then installing a B.O.P. commonly known as a , then lifting the fr.
[pdf] This article lists the main components of a petroleum onshore drilling rig. Offshore drilling rigs have similar elements, but are configured with a number of different drilling systems to suit drilling in the marine environment. The equipment associated with a rig is to some extent dependent on the type of rig but. .
1. 2. 3. (mud pump)4. 5. .
• (#22) is a section of large diameter pipe fitted to the top of the that the attaches to via a side outlet, to allow the to flow back to the .• (BOPs) (#23 and #24) are devices.
[pdf]